Access and scheduling
With stainless this heavy, the carry route counts for more than the mileage. Before the move we measure the old back door, the new one and every turn between the dock or alley and the line. Some reach-ins were set before the walls went up and will not leave the way they came; if a unit will not clear a door without taking the door off its hinges, the landlord and your contractor decide that, not our crew.
We schedule around the trades. Their disconnect usually happens after the last service, and our crew arrives once they have signed off the pieces, often first thing the next morning. The new kitchen needs to be ready to receive: floor finished, wall tile done, the trades booked for connection. Many downtown Sacramento and Chico buildings ask for proof of insurance, a certificate naming the owner, before any crew uses the alley or dock.