Access and scheduling
Fixture moves live inside someone else's schedule. A mall usually gives tenants a move-in packet covering the service corridor, dock booking, freight elevator, cart type, floor covering and the hours after shoppers leave. We work to that packet and send the certificate of insurance the property asks for before the dock is booked.
The other schedule is the build-out. On a new or remodeled space, paint, flooring and lighting trades often finish in the same week the fixtures arrive. Ask your contractor which zones are released, and we rebuild those first, leaving wet floors and ladders alone. Evening and weekend rebuilds can be booked on request.
Tall showcases and long gondola bases rarely fit through a mall storefront's customer entrance, so we measure the service route at both addresses before the date, including any tight corner between the corridor and the stockroom door.




