Access and scheduling
A short winter break leaves little slack. We ask the department to settle the room list before fall classes end, and district facilities to confirm dock and elevator time for the first days of the break, when campus is quiet. The receiving building is often brand-new, so the general contractor may still be on site with punch-list work; facilities tells us which doors and corridors are open to movers and which still belong to the contractor.
Portables usually have a ramp and a single door, and a truck cannot always park beside them. We plan the cart route from the nearest approved truck position, check the ramp width on the walkthrough, and size the crew to the carrying distance. When a portable is being hauled away after the move, facilities gives us the date it has to be empty. Weekend days can be arranged on request if the district opens the campus.