Access and scheduling
Design firms here occupy every kind of space: converted buildings in midtown Sacramento, second floors in downtown Chico, office-park suites in Roseville, Rocklin and Natomas. A flat-file section and a plotter both need a clear, level route, so at the walk-through we measure the tightest turn at each end and check whether the elevator can take a section lying flat.
We also ask where the old drawings are really going. Many firms use a move to send record sets out for scanning or offsite archiving, and it is far easier to pull those boxes aside before packing than to sort them on the new floor. When the new building asks for an insurance certificate, it is issued to the property manager before the date is booked.




