Access and scheduling
Ask the vendor for each procedure device how long release and reinstall take, and what the new room needs first: dedicated circuits, shielding for imaging, a sink or drain for reprocessing. Those come from your build-out contractor, and they set the earliest date the vendor can install. We schedule our loads around that date.
Outpatient buildings near Sutter Medical Center, Kaiser Roseville or Enloe usually want the move booked through the property manager, with a service elevator reserved, corridor protection laid and our certificate of insurance received before the date is confirmed. A single-tenant clinic in Yuba City or Folsom may only need the rear lot kept clear. On the site walk we measure the turns into pre-op and recovery bays, where reclining chairs need room, and pick a separate path for vendor carts. Summer moves start early so upholstered recliners are not left sitting in a hot truck through the afternoon.