Skip to main content
Property, Institutional & Government

State Agency Office Moving in Sacramento

Leased state floors downtown, on the Capitol Mall, in Natomas and at McClellan Park, moved around June 30, building security and surplus decisions.

(530) 354-8089
State Agency Office moving in the Sacramento Valley: Murdock's crew at work
  • Licensed & InsuredUSDOT 3421940 · MC 1416634
  • Locally OperatedChico + Yuba City
  • Sacramento ValleyChico · Yuba City · Sacramento

Start your state agency office move quote

verifiedFor estimate purposes onlycredit_card_offNo credit card required

Planning a State Agency Office Move

State department moves in Sacramento follow a rhythm of their own. The usual job is a leased floor downtown, along the Capitol Mall, in Natomas or at McClellan Park going to another leased floor, often as part of a consolidation now that telework is routine. The department's purchasing or business services unit writes the order, each building's security desk controls the doors, and the fiscal year that closes on June 30 decides how fast it all has to happen.

That deadline is the one to plan around. If the move is paid from the current year's budget, the order generally has to be in place before the books close, which can push the move itself into May or June. Tell us when the old lease ends and the new space opens, and the schedule is built backward from those dates.

Much of what sits on a state floor carries an asset tag, and not all of it is going. The department decides what moves, what is reassigned and what goes to surplus; the crew moves only what is marked. For the wider approach, see property and institutional moving.

Who usually signs off
Department facilities or business services manager, with the department's purchasing unit writing the order and building security setting entry rules
Timing that works
Backed off the June 30 fiscal-year close and the lease dates at both buildings, with dock time booked at each address.

What typically moves

  • Hoteling desks and shared workstationsConsolidated floors often trade assigned desks for shared ones; each piece is tagged to its new zone and desk number.
  • Asset-tagged furniture headed for surplusStays off the truck unless marked. We can gather it in one room for the department's own surplus process.
  • Program-unit lateral filesStaff box or lock them and keep the keys; each cabinet carries its unit and destination room.
  • Training room tables and stack chairsFlip-top tables, chairs and presentation carts grouped by room, ready for the first staff meeting.
  • Mail room sorting shelves and copy-room cartsMoved empty and tagged by the room they serve; supplies needed during the move go last.
  • Division chief and deputy director officesDesks, credenzas and bookcases, padded and placed from the office list.
  • Desk computers, monitors and docking stationsPlugged back in at the matching desk. Department IT handles network, phones and accounts.

Access and scheduling

Leased state buildings usually have a lobby security desk, badge readers on each floor and a property manager who assigns the dock and freight elevator. Security decides how the crew signs in, whether names are needed ahead of time and whether secured floors require an escort alongside the crew. Ask for those rules at both addresses, because the new building will have its own.

Downtown and Capitol Mall towers often share a tight dock with other tenants and have little street parking, so dock time is booked in blocks. Natomas and McClellan Park sites usually have surface lots and easier truck access but their own gates and check-in. If the daytime dock calendar is full, we can book an evening or weekend slot instead, on request. Property managers in these towers usually want proof of a mover's insurance before they book the dock, and our certificate goes to them whenever asked.

Protection and handling

State floors often hold the same furniture model in every unit, so each label carries unit, floor and desk number together. Released items are wrapped with the label outside, and undecided pieces are left where they are rather than guessed at. Freight elevator cabs and lobby floors are protected before the first cart moves.

Program staff set aside confidential files, keys and anything restricted before the crew arrives, and decide whether sensitive cartons travel with staff or sealed with the crew. The crew does not open cartons or read beyond the destination code. Asset tags stay on the furniture, so the department's property records still match afterward. Landlord fixtures, such as a built-in reception desk or mounted whiteboards, stay unless the property manager releases them.

Who does what

Some of this job belongs to other trades. The written plan names each one.

Order and fiscal-year timing
The department's purchasing or business services unit writes and approves the order under state rules and sets the deadline it must meet.
Building security, badges and escorts
Each building's security desk and property manager set sign-in, dock and escort rules; the department's facilities contact arranges passes.
Surplus, reassignment and asset records
The department decides what leaves state use, runs its own surplus process and keeps its property records current.

Not part of our work

  • Deciding what goes to surplus, or updating state property records.
  • Issuing badges or providing escorts.
  • Removing landlord fixtures or building-wired equipment without the property manager's release.

Around Chico, Yuba City and Sacramento

State departments lease space across Sacramento: towers and mid-rise buildings downtown and along the Capitol Mall, office parks in Natomas, converted buildings at McClellan Park and offices across the river in West Sacramento. Each has its own dock, parking and security arrangement, so a move between two of them is planned as two separate buildings.

The crew that shows up

Murdock’s movers working the loading ramp of an open box truckThe Murdock’s crew lined up behind the truck on an orchard road in Butte CountyMurdock’s crew rolling a shrink-wrapped piece on dollies through a building lobby

State Agency Office Moving FAQs

Another question? Call (530) 354-8089.

Our move is paid from this year's budget, which closes June 30. When should we start?

Start with your purchasing unit's timeline, since the order usually has to be in place before the books close. On our side, the dates that matter are the dock and elevator slots at both buildings and the day the new floor is ready. Send the lease dates early, and a walk-through can happen while the order is still being written.

Our new floor uses shared desks instead of assigned ones. How are items labeled?

By zone and desk number on the new floor plan rather than by person. Personal items go into staff lockers or labeled totes that follow the person, not the desk. Shared furniture is set out by zone, and department IT handles the docking stations and logins.

Can asset-tagged furniture we are surplusing stay in the old suite?

That is between your department and the property manager, since it affects the lease handoff. If it has to leave, we can gather tagged surplus in one room or load it separately for wherever the department's surplus process sends it. The asset tags stay on, so your property records can be updated.

Will security at the new building let the crew in without state badges?

Usually through visitor passes or a pre-submitted list, but security decides. Ask the new building's property manager for its contractor check-in rules and whether an escort is needed on your floor. We send the crew names or count they ask for and follow their route.

Plan your business move

Tell us both addresses, the building rules you know about, and the dates you cannot move. We will send back a written plan and estimate.

Call (530) 354-8089

Mon–Sat 8:00 AM–6:00 PM · Sun 10:00 AM–4:00 PM

Call Nowcall530-354-8089