Access and scheduling
Each branch's building sets its own rules, and those go on its access sheet rather than into the shared plan. A downtown Sacramento office may need a booked freight elevator, with our insurance certificate sent to the manager, before loading. A storefront branch in Chico may load from an alley behind the building. A Yuba City branch may need its small lot cleared of customer cars before the truck arrives.
Your operations director sets the sequence and how much customer coverage each branch must keep. Branches at opposite ends of the Valley rarely share a crew day, because the drive between Chico and Sacramento takes a real share of it. Clustering nearby branches, such as Roseville and Rocklin, into back-to-back days keeps travel time down. Before each branch is packed, its manager confirms the floor plan, labels and access sheet, so changes from earlier branches are applied on purpose.