Access and scheduling
In its last weeks, a buildout is still a construction site, and the GC controls it. We ask the superintendent which entrance and elevator the crew may use, where materials are staged and whether floor protection must stay down. If the property manager also has move rules, such as booked elevator time, loading hours or an insurance certificate made out to the owner, we meet those too.
Construction dates move. An inspection fails, a door is back-ordered, a floor needs another day to cure. We book against the occupancy date and stay in touch with your facilities lead through the final week, and if the release map changes, labels and unloading order change with it. The surrender date at the old suite does not move, so we leave room after the move for restoration and the walk-through.